Project Summary:
Pakal Dul HE Project (1000 MW) is proposed on river Marusudar, a tributary of river Chenab in district Kishtwar of J&K state and is about 45 kms from Kishtwar. The project envisages construction of a 167 m high Dam, an underground Power House with 4 units of 250 MW each.
Client:
Afcons Infrastructure
Scope of Work:
Supply, Installation, Monitoring and Data Analysis of Geotechnical Instruments at Pakal Dul Hydroelectric project in construction of Civil works comprising of part Head Race Tunnels, Adits, Surge Shafts, Pressure Shafts, Valve House, Underground Power House, MIV Cavern, Transformer Cavern, Adits & Access Tunnels, TRT, TRT Outlet Structure and Pot Head Yard etc. of PDHE Project.
Instruments Used:
Piezometer, Multipoint Borehole Extensometer, Single Point Borehole Extensometer, Tape Extensometer, Load Cell, Stress Cell, Strain Gauge, Thermometer, Data Logger System, Junction Box, Cable.