Project Summary:
Govt. of India planned a 272 Km. long Railway Line from Udhampur to Baramulla joining the Kashmir valley with the Indian Railways network under Udhampur-Srinagar-Baramulla Rail link Project (USBRL). In view of importance of USBRL project in providing seamless and hassle-free connectivity, the Project was declared as “National Project” in 2002. This Project involves 38 Tunnels (combined length of 119Km), the longest Tunnel (T-49) is having a length of 12.75 Km and once completed will be country's longest transportation tunnel. There are 927 nos. of Bridges (combined length of 13 Km).
Clients:
- T2/T15: Patel Engineering Ltd.
- T-48: IRCON
- T-49A: IRCON
- T-74: Beigh Construction Co. Ltd.
Scope of Work:
Supply, Installation, Monitoring and Data Analysis of Geotechnical Instruments with contractor’s own total station & its accessories by deploying manpower on Katra-Banihal Section and Dharam Qazigund Section of Udhampur- Srinagar- Baramulla New BG Railway line Project.
Instruments Used:
Optical Target, Radial Pressure Cell, Strain Meter, Multipoint Borehole Extensometer (MPBX), Borehole Piezometer, Anchor Bolt Load Cell, Junction Box, Readout Unit.